Utility-Scale
Brandenburg Solar Park
A 62 MWp Utility-Scale project in Brandenburg, Germany — engineered, delivered and operated by Oakridge.
- Location
- Brandenburg, Germany
- Capacity
- 62 MWp
- Annual output
- 61,000 MWh
- CO₂ avoided / yr
- 25,600 t
- Completed
- 2024
This project illustrates Oakridge’s end-to-end delivery: from feasibility and yield modelling to installation, grid connection and long-term operation. Replace this text in the admin panel with the real case-study details, client outcomes and imagery.
More work
Related projects.
Commercial 2025
Hamburg, Germany
Logistics Hub Rooftop Array
Capacity
4.8 MWp
Output / yr
4,500 MWh
CO₂ avoided
1,900 t
Storage 2025
Stuttgart, Germany
Manufacturing Plant Storage Retrofit
Capacity
3.2 MWh BESS
Output / yr
−38% peak load
CO₂ avoided
640 t
Agri-PV 2024
Lower Saxony, Germany
Agri-PV Demonstration Site
Capacity
8.5 MWp
Output / yr
8,100 MWh
CO₂ avoided
3,400 t
Let’s talk
Ready to switch on?
Book a free feasibility consultation. We’ll model your yield, savings and payback — with no obligation.