Projects
Proof, measured in megawatts.
A selection of rooftop, storage and utility-scale projects we have engineered, delivered and operate.
Commercial 2025
Hamburg, Germany
Logistics Hub Rooftop Array
Capacity
4.8 MWp
Output / yr
4,500 MWh
CO₂ avoided
1,900 t
Utility-Scale 2024
Brandenburg, Germany
Brandenburg Solar Park
Capacity
62 MWp
Output / yr
61,000 MWh
CO₂ avoided
25,600 t
Storage 2025
Stuttgart, Germany
Manufacturing Plant Storage Retrofit
Capacity
3.2 MWh BESS
Output / yr
−38% peak load
CO₂ avoided
640 t
Agri-PV 2024
Lower Saxony, Germany
Agri-PV Demonstration Site
Capacity
8.5 MWp
Output / yr
8,100 MWh
CO₂ avoided
3,400 t
Industrial 2026
Rotterdam, Netherlands
Distribution Centre Hybrid System
Capacity
2.6 MWp + 1.5 MWh
Output / yr
2,400 MWh
CO₂ avoided
1,000 t
Commercial 2026
Dubai, UAE
Hospitality Resort Microgrid
Capacity
1.9 MWp
Output / yr
3,300 MWh
CO₂ avoided
1,400 t
Let’s talk
Ready to switch on?
Book a free feasibility consultation. We’ll model your yield, savings and payback — with no obligation.